Multi-layer solid wood flooring installation method Introduction

Multi-layer solid wood flooring installed a direct impact on the effect of the use of the multi-layer solid wood flooring with life, peace of mind to the floor to introduce you to three common use multi-layer solid wood flooring installation method, consumers can choose according to their actual situation the multi-layer solid wood flooring installation method.

Straight paste multilayer wood flooring installation method (applicable to geothermal and non-ground heated): moisture-proof cloth + floor

Scope: applies to ground height difference of plus or minus 2mm.

2, the installation steps:

(1), the refurbishment good ground, first laying moisture-proof cloth to cover the entire ground, in order to achieve balanced production of moisture-proof soundproof effect. Geothermal cushion material should not be too thick to facilitate heat conduction.

(2) in a moisture-proof cloth capped multilayer solid wood flooring.

Straight shop multilayer wood flooring installation method (applicable to non-geothermal): plywood + moisture-proof cloth + multi-layer solid wood flooring

Scope: Suitable for surface flatness of not more than 5MM and the second floor above the ground.

2, the installation steps:

(1) to clean up the ground. The plywood should be cut or sawn, not greater than 600 600mm specifications set aside 5 to 10mm gap between the plywood and the plywood.

(2) moisture-proof or flame-retardant foam, laying on the plywood wall moisture proof ground cloth should be more than 8-10MM, do not paste between the plywood and moisture-proof cloth.

(3) before the multi-layer solid wood flooring shop in a moisture-proof cloth, do not paste between the multi-layer solid wood flooring with a moisture-proof cloth, and driven into a fixed multi-layer solid wood flooring in the public tenon 45-degree angle to the nail without a head.

Raised multilayer solid wood flooring installation method (for non-geothermal): dedicated wood keel + thick plywood + moisture-proof cloth + floor

Scope: Suitable for surface flatness of not more than 5MM and the second floor above the ground.

2, the installation steps:

(1) prepare a special wooden keel between wood joist spacing is less than or equal to mm. The surface must be flat rack.

(2) coated with a water-resistant adhesive on the wooden keel, the thickness of the plywood laid on the skeleton of about 12 mm, the jaws should be sawn into not more than 600 × 600 mm Unit 5 to 10 mm, the spacing between the splint and the splint, then airguns headless nails into the plywood skeleton fixed.

(3) in the splint capped with a moisture-proof fabric, multi-layer solid wood flooring in moisture-proof cloth capped, in public tenon to a fixed multi-layer solid wood flooring headless nail driven into the correct 45-degree angle;

Note: In fact, the multi-layer solid wood flooring installation by installation workers, so this little introduction of the multi-layer solid wood flooring installation steps, at ease floor needs to remind consumers: multi-layer solid wood flooring installation must select seasoned, skilled installed.