In other countries, is widely used to warm the commercial, family and other buildings ; in China , to warm the crowd from the top and gradually spread to the general well-off families. It is recognized as the most comfortable and environmentally friendly way of heating the entire system, including pre- design, construction, installation and after-sales maintenance cleaning . But the choice of warm and the entire installation process is also important to note that there are some places and some limitations. We explain here :
First, warm design phase
Warm in the early design time, pay attention to four points : one , to warm the product design must be the overall design based on the selection of heating systems ; 2 , to warm the pipe spacing designed to be moderate ; 3 , to warm the pipe length designed to be moderate ; 4 , temperature designed to moderate. Preliminary design is reasonable, actual results will directly affect the final warm to use, economical and practical. Such services are generally designed to be carried out by the company or purchase warm professional designer or interior design company pots for composite decks.
In addition , it is recommended to select a user selects the ranking in comparison to warm the leading brands , such as Vaillant and other international brands when heating pipes, pipe circulation pump , decoupling cans , controllers and other more specialized heating system accessories ; thus avoiding encounters quality late trouble to ensure optimal use of floor heating systems and optimal energy efficiency.
Second, pre- installed ready to warm
All design work and the local warm to warm the equipment purchase is complete you can contact the relevant personnel after installation , but please note the following five preparations before loading used pool decks for sale:
1 radiant floor heating systems and other types of construction should avoid cross construction work ;
2 decorating company commissioned early lead contact is responsible for electrical designers, installers warm synergy to the construction site , determine the power layout plan ;
3 hydropower construction site shall ensure that the pipeline construction is completed , the kitchen , the bathroom and closed water test should be done after the inspection, construction area of ground level clean, no bare steel , equipment, construction of water pipeline and conducted any impact , materials, debris and so on ;
4 pisolite concrete backfill by the warm decoration company or construction units are the same, the company is generally recommended for this project decoration , decoration companies do backfill , also may bring attention to reduce the possibility of damage to the construction of warm maximum extent ;
5 owners should help to warm the construction team and property companies , the relationship between the neighborhood and create conditions for normal construction , including those responsible for the property and other relevant provisions apply .
Third, to warm the installation considerations
Warm before installation, pay attention to supervise the installation personnel check the flatness of the ground , the flatness of less than or equal to 3mm/2m, if it exceeds the standard requirements, should be leveling , otherwise will have ring floor after installation ; addition all rooms have hidden works acceptance qualified, ceiling and lighting in the room should be installed vinyl deck boards price.
In addition , good moisture-proof flooring installation process is very important . Typically , the installation process is just a layer of moisture under the floor mat mats joints sealed with tape also very strict . But when the local high temperature heat to produce heat unglued after tape , sealing moisture pad connections produce breathable, moisture is likely to cause failure . Therefore , on the ground to spread a layer of plastic film and tape seal moisture can play a very good effect . In addition, the top layer of plastic film mats both holes and moisture effects , but also a buffer effect.
没有评论:
发表评论