1, can not have ice in the sand
Low winter temperatures will have a greater impact on the strength of concrete and cement mortar solidified and solidified, it will lead to lower quality, and keep the indoor temperature is the key to this procedure is. But most home decor loaded rarely involved in civil construction, so the problem is not widespread. Should be carefully sifted sand, can not have ice, appropriate Gaga antifreeze, when mixing mortar, the water temperature should not exceed 80 ℃, with the use of the ground to adjust, bricklayer construction of curing time will be extended from 48 to 72 hours.
Water, electricity lines slotted construction, filling the grooves with cement mortar should be used rigid gas (dry) mortar, after 48 hours and should be filled (temperature above 5 ℃) ended after only scrape into walls or other works processes alternative decking materials.
2, caution antifreeze
Caution antifreeze. Winter construction, there is a question of the use of antifreeze. Antifreeze used in the building construction equipment, enabling the concrete to harden at negative temperature, and within the specified time to achieve sufficient antifreeze strength. However, the main ingredient in antifreeze nitrite excessive intake will be poisoned if disposable. Therefore, construction equipment in the winter, you should try to use other measures to deal with the problem of freezing.
3, how to deal with the strong cold air coming
Although a mild winter, but only say the whole year round average temperature higher than the winter, not to say that does not appear strong cool weather. Thus ended coatings at low temperatures into the construction, ventilation window after snow melt still pay special attention. Application temperature should be above 5 ° C. As the ambient temperature of the paint should not be applied below 5 ° C, therefore, the winter-build construction should pay attention to the first closed the doors and windows to ensure that the indoor temperature is at least not less than 5 ° C. So that one can ensure that the indoor temperature, it can also hide free outdoor sweeping sand onto the furniture and the wall is dry, rough uneven emergence of the phenomenon. While warm winter rain and snow falls, because the surrounding buildings (especially air) temperature is high, the snow reaches of the air immediately, and not easy to form snow. Ventilation window in such an environment, such as the paint should be dried thoroughly, and then open the doors and windows and airy, and pay attention to the time pvc wall cladding south africa.
4, not too thick putty grab
Because indoor air is dry, out of the water faster, putty before the Oilers can not grab too thick, otherwise it is likely to cause hollowing, cracking walls inequality.
Indoor cement mortar plastering, tiling and other processes, near Heating, he shall cause the mortar to prevent localized high temperature drying too fast formation of cracks, peeling tiles and other phenomena outdoor wpc vertical wall panel.
5, pay attention to the protection of Heating
1: Protect the construction good heating fins pipeline. Once construction beneficial and bad, there are hot Kean Li trouble.
2: In the window of the radiator often, because the breath of window construction, attention to people walking windows shut. Once prevent night without water, with the windows open easily damaged by frost radiator. These are the Winter decoration 5 installed networking equipment built to introduce you to the top ten common sense, I hope for your support. For more information please visit decorative five home networking equipment. Decorative 5 installed networking equipment built wish you happy!
没有评论:
发表评论