2014年4月27日星期日

Top 5 Considerations winter decoration

Note 1: The design is not greedy , " warm" part of the decoration on the design focus reminder before home rule, is very simple production of dead people " warm " winter illusion of doing home design, natural and naturally like some warm However, if the room is too warm , wait until the summer will feel hot . Therefore, to maintain the proper use of some suitable color adopted . Even if it is warm or cold like the color , but also need to have moderate to adjust the color , such as white kind of intermediate colors .

Note 2 : Construction grasp the temperature difference - the following topics influence who is not a rule in Chengdu
Northern winter , when cold air to the sharp decline in temporary temperature Rhyme , low temperatures ( utterly special rule, is accompanied by scraping the wind ) would affect the composition of building materials : a contraction , one is the evaporation of water . Therefore, the decoration of the main material used , especially timber should get ready in advance , preferably in the indoor heating equipment placed 3-5 days , so that the moisture content of the wood close to the level of the house , in order to avoid appearing deformed after renovation ; sand should carefully sifted , can not have ice, you can add some antifreeze according to practice proper construction needs, stir the mortar when the water temperature should not exceed 80 ℃, cement construction is not in the open air , to make antifreeze ; Oilers in all types of paint stencilled should be strictly in accordance with the product instructions temperature paint coatings applied ambient temperature should not be lower than 5 ℃, varnish is applied when the ambient temperature must not fall below 8 ℃, oil workers live pay attention to " warm ", fully dry before open doors and windows for ventilation cheap decking timber.

Note 3: The construction of the anti-separation wall surface crack
After the construction of the winter , either wall or floor tiles , to be moved indoors from the outdoor transition 24 hours , adapted to paving the indoor temperature to avoid appearing empty after construction full , shedding phenomenon , should be promptly after the brick paving pointing. Putty can not grab too thick. Because indoor air drying , dehydration and rapid , simple cause otherwise empty full, crack, wall inequality. If you encounter a rule, the wind cool weather, the work is not suitable for the oil industry , due to the dust coating and wet paint adhesion simplicity . Putty does not dry on the paint brush , wall simple " sweating " and even has a rule area of ​​the cracking phenomenon , often windows open for ventilation , preferably in time between the relatively higher temperatures of 10:00 to 16:00 Composite Decking Railing.

Note 4 : carpentry products to retain the gap
Construction of wooden products in the winter , but also exceptionally " hold back " : the door should not be too small , so in the summer the door tight , you can not switch freely ; while laying wood floors, four weeks set aside about 2 mm joints , otherwise it will cause from the full, floating phenomenon ; doing furniture , to be set aside about 0.1 mm interface seam to avoid distortion ; carry gypsum board ceiling job, the moisture content of the wood keel must be controlled below 12% , and the keel must be firm, not thrown a little loose , so you can prevent the gypsum board ceiling cracks. Between the gypsum board, gypsum board joints between walls and place are leaving a gap of about 0.5 cm , plus latex caulk to reconcile with gypsum powder and then double- stick kraft paper, then putty to prevent plaster cracking outdoor deck boards.

Note 5 : Acceptance of focused
After winter decoration , acceptance deserve emphasis falls on the left seam , stickers , affixed cloth , carefully check for cracking phenomenon. Also look carefully whether there were significant gaps and uneven floors , the floor and the skirting boards are close together and so on. However, due to the winter wooden floors should be appropriate to keep the seam , so some gaps are allowed.

Note 6: The environmental inspection renovation
After the renovation is complete, the rule, the amount of furniture, carpets, put the fabric into the room , and then into the ventilation should be vacant a few days to live , to avoid centralized rule, the amount of volatile hazardous substances , pollution of the environment , all the furniture should be open for a few days after the vacancy put clothes hanging .

Summary: The above title may not know who is concerned to do the decoration , or a little difficult, but as long to find formal decoration company , so it is not subject to those topics , and it also has a very winter decoration Eve advantages Eve is very favorable , whether it is the decoration company or decoration materials , Rhyme years ago, when the impulse of some businesses , all deals are very Eve .

没有评论:

发表评论