We should be how to install built? Decoration 5 installed network construction early for you to consider these issues to ensure the quality of construction details from the top ten.
First, in order to ensure constant ventilation gas cast fast
1, winter after continuous ventilation equipment built over at least seven days after a large number of furniture, carpets, fabrics put into the room, the ventilation should be vacant after a few days stay, hide a lot of harmful substances in bulk free volatile, polluting the environment, all the furniture should be open the door a few days before the vacant place to hang clothes.
2, room ventilation should adopt the south side of the large windows, small windows on the north side of the ventilation method, the reasonable control of the indoor temperature and ventilation, not strong ventilation composite wood with plastic.
3, can be appropriately open kitchen exhaust fan, kitchen> kitchen smoke machine to strengthen indoor ventilation volume.
4, air humidifier accepted into the only indoor air humidification, water containers can be placed on the acceptance of indoor heating methods such as Jin ended humidification, keep indoor air moist.
5, try to accept the surfactant as the main ingredient of washing liquid to clean equipment and clean room construction signs, do not accept the highly volatile solvents such as: gasoline, alcohol and so on.
6, wooden floors waxed once a week or every two weeks, not frequent waxing, daily wipe with a damp soft BuTuo can. 7, appropriately placed indoor greenery.
Second, avoid free wood cracking deformation
1, timber, away from heat plates stacked 800mm, free to hide lead to cracking due to overheating of wood and sheet metal deformation. 2, upon acceptance of geothermal heating room, stacked wood and all kinds of artificial board to add skid plate on the bottom side, hide free wood cracking and deformation.
3, each a pair of two decorative panels, face to face stacked layer by layer plane and loaded with Daixinban pressure on the surface, to ensure no curl decorative panels, no distortion, no cracking outside decking.
4, water-based paints, glue should be stored at a higher temperature of the room, hide free on the balcony, north to the room to prevent freezing. 5, paints and volatile chemicals should be stored separately from the heat source near the room either continuous ventilation.
6, using the van transport construction materials, water-based paint, glue, insulation materials after application packet transport hide free frozen.
7, decorative panels of three, Wuli board ban on top loading stowage, hide free transportation history deformation and cracking. 8, water-based materials to the site should be carried out only after the inspection, if found to deterioration, degeneration should be promptly returned to the Treasury, is prohibited.
Third, the temperature should not be less than 5 degrees Celsius
Room temperature is below 5 degrees Celsius, can not carry out construction in winter. Low winter temperatures, plaster, putty, tiling and other work surface if the cold, there will be hollowing other quality problems. No room for heating, when the temperature is below standard, the construction should be suspended or increased heating equipment to increase the indoor temperature.
Fourth, to prevent the fire scene
In the winter-build some houses do not have indoor heating, and some construction workers will be installed in the room with open fire and warm, this is very dangerous, very easily lead to hypoxia, poisoning or even a fire veranda deck board price.
Also excessive dust should be noted that in dry areas, dust (powder final form flammable solids) in the case of fire reaching the inevitable concentration may cause an explosion. Because there just purchased materials generally volatile flavor is strong, do not open the window it is easy to poisoning.
Outrageous Tip: In the winter-build, best to give workers enough warm clothing or blankets, if possible, it is recommended that people do not work overnight at room temperature without heating or low construction Factory.
Fifth, the timber 3 days and then put in the room
Winter indoor and outdoor temperature, either wall or floor tiles, will have to adapt, such as when the indoor temperature to show stickers, avoid hollowing after construction, shedding phenomenon. Further, also installed wood floor exhibition of line concerned, if the indoor temperature is relatively high, the development of equipment for the gap between the wood as small as possible, on the contrary, if the indoor temperature is relatively lower gap, between the board and the board can be bigger.
The best wood heating equipment in the room have placed 3-5 days to volatilize due to temperature changes bear moisture, so the moisture content of the wood close to the level of the house, and some accessories like wooden keel timber, wood, gypsum board, etc., easily After the damp mildew and cracked deformed, should be free to hide such a situation.
没有评论:
发表评论