2014年5月25日星期日

Where should start renovation acceptance

After the completion of housing decoration , acceptance hurdle is essential. Owners of the works acceptance criteria are decorated contract , signed by the owners of construction drawings and decorative works of the national quality inspection departments of the relevant documents , specific acceptance mainly from the following aspects : ( a ) Furniture smooth lines , sealing line, angle line with the panel interface dense, smooth, smooth sliding door cabinet drawers , handles symmetrical appearance. (B ) to comply with the laying of the power line circuit construction procedures and safety standards , the socket is not less than 30 cm from the ground , three-wire grounding receptacle , kitchen electricity and air conditioning lines dedicated to laying, total gate leakage power switch is installed , lighting installation firm . (C ) switch freely doors , door frames, window frames and glass surrounding the seal is good. (D ) Ground floor tiles smooth, clear texture , uniform color, mosaic tiles crosshair horizontal, vertical , wooden flooring real smooth , straight patchwork uniform , consistent paint color, no scratches . (E ) a solid wall wallpaper paste , tight joints , complete pattern , pattern match, burr-free edge seams and edges ; paint smooth, and no concavity, no color, can not afford to ash. (Vi ) water supply and drainage facilities , no leakage , switching valves work well ; smooth drainage , no leakage, water phenomenon . (Vii ) the paint finish is smooth , feel good, enough oil , no nail holes , scratches, burrs and color composite fence panels uk.

In short, the acceptance of new homes carefully , it is best to turn on all the lights sources , in order to avoid unnecessary trouble in the future.

③ water reform , the attention surrounding must be clean. When contracted water reform , water reform marked with the best materials . Also pay attention to the size of water mains in the transformation of the original room , the external water pipes under the best match of the tube and the original pipe . ④ circuit transformation , we should pay attention to in order to better advance the whole house lighting , appliances installed in any place, in order to determine the location of switches and sockets , as well as pay attention to the price of new embedding and change the line is not the same . Best buy wireless doorbell doorbell . Finally, note that it is best stated in the contract and so be sure to complete the woodwork after the water reform approach , the benefits of doing so are: users do not also concerned about two things , water reform is decorated in a very important work, but also the decoration the bulk of the company's profits . And a lot of water reform concealment , if carpentry while entering the construction , will distract your attention and will not devote attention to water reform outdoor screening panels.

Keywords: how much would it cost to build a deck a round my above ground pool wpc composite manufactures plastic wall tiles panels buy outdoor wood plastic fence recycled material to build exterior stairs cost to have deck built plastic dance floor mat weatherproof patio flooring options composite front steps and landing white resin split rail fence deck plan round above ground pool snap together plastic patios composite decking costs and materials synthetic deck installation costs wooden floors for sale outdoor deck wood materials.

没有评论:

发表评论